More Delta Glazing articles in the Manchester area.
Manchester, Recent Projects
Cycle City, Manchester
During the commission of robbery before Christmas, a car was driven through the “armour plated” glass doors to enable the contents of the shop to be stolen.
Delta Glazing were called in to secure the premises through boarding up, and create a temporary door to enable trading to continue whilst a more permanent solution were found.
We manufactured for the client “Toughened Glass Panels” and installed them. As with all projects like this, there was extra work to be completed, namely, the metal rails that held the glass in place has to be repaired as they had been damaged and the locks required removal and replacement.
Pulling out all the stops, we completed the project in only 4 days – another happy Delta Glazing client.